eLABa objektas: "Rekonstruotos Jurbarko nuotekų valyklos efektyvumas", 2010,D:20100616:103144-42430 |
|
| E. dokumentai |
|
| URL nuoroda |
http://vddb.laba.lt/obj/LT-eLABa-0001:E.02~2010~D_20100616_103144-42430 |
| Dokumentas |
Magistro darbas
|
| Prieigos teisės |
Laisvai prieinamas internete.
|
| Institucija |
Lietuvos žemės ūkio universitetas
|
| Mokslo kryptis |
03 B - Ekologija ir aplinkotyra
|
| Atsakomybė |
Venckus, Julius - Magistro baigiamojo darbo autorius Kustienė, Renė - Magistro baigiamojo darbo vadovas Žibienė, Gražina - Magistro baigiamojo darbo recenzentas Patašius, Algimantas - Magistro baigiamojo darbo recenzentas Venckus, Julius - Magistro baigiamojo darbo autorius Lietuvos žemės ūkio universitetas - Mokslinį laipsnį teikianti institucija
|
| Antraštė (-ės) |
Rekonstruotos Jurbarko nuotekų valyklos efektyvumas Jurbarkas reconstructed sewer treatment plant efficiency
|
| Santrauka [EN] |
The paper examined the reconstructed Jurbarkas domestic wastewater treatment plants performance.
|
Purpose of the survey - the wastewater treatment plant efficiency of aeration system reconstruction.
|
The object of research - Jurbarkas domestic wastewater treatment plants enters an aeration system that was installed in 2008. To achieve these goals has been to move the following tasks: a theoretical description of the biological treatment plant, which affect the biological treatment process and evaluate the effectiveness of the active sludge system changes, the efficiency of wastewater remediation Jurbarkas wastewater treatment facilities, to carry out a comparative analysis of linear and circular aeration system, the sewage treatment plant Jurbarkas electricity costs.
|
Sewage treatment plant efficiency has been studied by BOC7 nitrogen (Nb), phosphorus (Pb) elimination of the water before aeration system replacement and the replacement of aeration systems.
|
The investigation showed that sewage treatment facilities after renovation work reliably. Effluent residual contamination does not exceed the MRL. BOC7 treated water decreased by 16%, total nitrogen (Nb) - 27%, and total phosphorus (Pb) - 56%, compared with BOC7, Nb and Pb before aeration system replacement. Chemical reagent process steps used 488.8 kg/m and less, while at the same time is 22295.2 Lt/m. less cost. Electricity costs have fallen about 14 percent.
|
|
Raktažodžiai: sewage, treatment facilities, biological waste water treatment, aeration systems |
|